WCC Group offer a large variety of works from gabion basket installations and stone work to tree surveys, tree reduction, forestry maintenance, ground maintenance to more specialist work such as confined space, working at height like rope access, scaffolding and IPAF operators. Check out some of our projects listed below.

WCC Group carried out tree and scrub clearance works and repair works to a collapsed drainage pipe and gabion basket installation works to the Kirk Brae area of Shandon.

Working for JBD Tritec WCC Group staff were contracted to install 80 foundation pads for a steam pipe in HMNB Clyde. The project quickly grew and WCC Group was more than happy to accommodate the new needs of the client.

WCC Group carry out a tree survey for Cameron Lodges on Loch Lomond on over 200 trees and provided a report advising what works should be carried out to ensure the trees did not cause harm to the properties or their guests. WCC Group then carried out the removal branches and where required dead trees.

Rosneath Caravan Park enlist the help of WCC Group to improve their sea defence to protect their grounds and ensure a more enjoyable stay for their visitors. WCC Group were able to install a 2 story gabion basket wall to build up the ground that have been taken by the sea and limit future damage.